On August 7, Changsha Municipal Planning Bureau today issued the standard for the allocation and construction of motor vehicle parking lots (garages) for construction projects in Changsha (hereinafter referred to as the trial standard). The trial standard stipulates that when the building construction area is greater than 500 square meters (including 500 square meters), parking lots (garages) should be set up, and the allocation and construction of parking facilities for various public buildings should be open to the public after completion, Encourage the construction of parking lots (garages) for non-public buildings to be open to the society. The trial standard does not specify the parking spaces outside the subway station in the area surrounded by the east of Xiangjiang River, the south of Sany Avenue, the west of the East Second Ring Road and the north of the South Second Ring Road, but requires that the parking spaces outside the subway transfer station or hub station outside this area shall be set according to the standard of 2 parking spaces per 1000 passengers on the design day. Will this promote the development of the intelligent parking industry? We'll see!
![Changsha Trial Standard: Parking Lot Shall Be Provided for Building Area of More Than 500_ Taigewang 1]()