loading

Structural Construction of Hospital Basement: Building a First-class Parking Lot Management System -

The construction of parking lot management system for key projects is an important starting point. At present, we should promote high-quality catch-up and development. A number of provincial and municipal key projects are fully promoting and accelerating the construction to ensure that the annual objectives are exceeded. It is also a double 100 billion project and a people's livelihood improvement project promoted by the new town. Since this year, the hospital has been a provincial and municipal key project. The hospital has completed an investment of 230 million yuan and is expected to exceed the annual investment task of 350 million yuan this year. It is divided into 16 construction areas. This hot construction site is the construction site of the hospital. Among them, plot 3 is progressing the fastest. The person in charge of the scene told reporters that in order to speed up the progress. The "zero time limit" rapid quality acceptance method is adopted for each construction process, and the quality supervision and supervision personnel follow up the acceptance at any time, so that they can be put into the construction of the next process in the shortest time. Under the effective organization of the agent construction unit, the hospital entered the main construction in July this year. Most of the pile foundation construction was completed in only more than three months, and the plots that completed the pile foundation earlier were crossed for the construction of basement structure. According to the parking lot management system, a total of two floors will be built in this basement, of which the negative first and negative second floors will be mostly used as parking lots, with 3284 parking spaces, including 1448 social vehicle berths, except that part of them will be integrated with hospital facilities. In addition, the basement and the ground overhead platform are also connected to the subway, bus and other rural public transport to realize the diversion of people and vehicles. In the future, it will be very convenient for people to seek medical treatment, parking and access here. In fact, the people who seek medical treatment come down from this site. The project manager of the parking lot management system residential group special agent company: the bus is at this Longjiao Road, which is a site under the overhead platform. The second is that after the entrance of the subway station, it is directly connected to the basement of the hospital, and you can come to the hospital area through the escalator, that is, people who seek medical treatment may go to the hospital directly without an umbrella, focusing on building two characteristic specialties of tumor and acute and critical illness. The hospital is based on It is a three-level general hospital with the goal of "small comprehensive, large specialty, high-quality products, characteristics and integration of industry, University and research". The overall scale will reach 1500 beds, and 1000 beds will be built in the near future.

Structural Construction of Hospital Basement: Building a First-class Parking Lot Management System - 1

GET IN TOUCH WITH Us
recommended articles
Cases
no data
Shenzhen Tiger Wong Technology Co., Ltd is the leading access control solution provider for vehicle intelligent parking system, license plate recognition system, pedestrian access control turnstile, face recognition terminals and LPR parking solutions.
no data
CONTACT US

Shenzhen TigerWong Technology Co.,Ltd

Tel: +86 13717037584

E-Mail: info@sztigerwong.com

Add: 1st Floor, Building A2, Silicon Valley Power Digital Industrial Park, No. 22 Dafu Road, Guanlan Street, Longhua District,

Shenzhen,GuangDong Province,China  

                    

Copyright © 2024 Shenzhen TigerWong Technology Co.,Ltd  | Sitemap
Contact us
skype
whatsapp
messenger
contact customer service
Contact us
skype
whatsapp
messenger
cancel
Customer service
detect