Concrete construction process design service process of permeable license plate recognition manufacturer: 1. The customer has a comprehensive communication with our sales representative to determine the cooperation intention; 2. The company can provide customers with creativity and design schemes, including permeable floor manufacturers_ Hubei permeable floor manufacturer. Until the customer is satisfied; 3 sign the construction contract, and the engineering guidance personnel will provide you with the construction scheme and the implementation of all cooperation contents specified in the contract. Pervious concrete is a kind of porous lightweight concrete mixed with aggregate, cement and water_ Hubei permeable floor manufacturer. The surface of coarse aggregate is coated with a thin layer of cement slurry and bonded with each other to form a honeycomb structure with evenly distributed holes. Therefore, it has the characteristics of air permeability, water permeability and light weight. It can also be called drainage concrete. It is widely used in sidewalks, parks, squares, stadiums, botanical garden roads, lightweight roads, parking lots, underground construction projects and new sports venues. Preparation of permeable floor materials of license plate recognition manufacturer: permeable concrete construction is essentially similar to cement concrete construction. Only sand is missing in the original guess, while high-material gravel with certain particle size replaces aggregate, which has a certain amount of data in the construction. Cooperate with the civil engineering team as the foundation party to lay the special permeable pipeline together with the above ground and bottom layer. In addition to laying the permeable pipeline according to the requirements of the drawing, it is necessary to connect with the original road drainage system and become a part of the road drainage system. Carefully fill and compact the low-lying or potholes on the surface of the subgrade. The washboard and rut groove of the license plate recognition manufacturer shall be scraped off, and the loose water shall be rolled from the top to the flat and dense. When the subgrade is wet, the groundwater level or surface water level is high. If the subgrade is clay or loam with poor water permeability, an isolation layer can be added to collect the rainwater soaked in the surface layer or discharge it outside the subgrade.
Shenzhen TigerWong Technology Co.,Ltd
Tel: +86 13717037584
E-Mail: info@sztigerwong.com
Add: 1st Floor, Building A2, Silicon Valley Power Digital Industrial Park, No. 22 Dafu Road, Guanlan Street, Longhua District,
Shenzhen,GuangDong Province,China