ロゴ

How to Install a Tripod Turnstile: Site Preparation and Commissioning Checklist

TGW-TT028 product view; verify the ordered configuration before marking the floor

A reader drawn too close to the cabinet can block the service panel once the tripod gate is anchored. Moving it after the floor has been drilled is an expensive way to discover a drawing error. Before installation day, put the cabinet, reader, cable entry, arm movement and maintenance access on one agreed lane plan. This checklist begins after the gate model has been chosen. It gives the owner, installer and integrator a common sequence for preparation and acceptance. Anchor sizes, terminals, electrical protection and safety connections still come from the ordered model’s manual and the qualified trades working on site. What must be fixed on the drawing before the […]